Production Operations – 5 days

Typical Content
Subsurface Operations
o   Standard Completions
o   Packers
o   Tubulars - Identification, Materials Selection, Torque etc.
o   Tubing Accessories - Materials and Elastomers
o   Wireline Toolstring - Preparations before Running
o   Wireline Surface Tools and Equipment
o   Care and Handling of Wireline
o   Subsurface Safety Valves
o   Well Testing, Equipment and Layout
o   Well Services Workshop- Layout and Equipment
o   Workover Hoists, Coiled Tubing Units, Hydraulic WO Units etc.
o   Wire Rope and Cordage
o   Well Pulling
o   Subsurface Pumps
o   Sucker Rods and Torque
o   Subsurface Pump Repair Shop and Pump Repair Guide
o   Safety Precautions during Well Entry
o   Gas Lift Valves
o   Testing, Calibration & Running of Well Survey Equipment
Surface Operations
o   Well Protection
o   Christmas Trees, Valves and Fittings
o   Well Control – Chokes
o   Manifolds
o   Separators
o   Pig Launching and Receiving
o   Chemical Injection
o   Drains and Drainage Systems
o   Venting, Blowdown, Gas-Freeing and Purging
o   Metering and Measuring
o   Oil Dehydration
o   De-Oiling, Water Disposal and Sludge Treatment
o   Gas Handling/Treatment
o   Equipment/Process Protective Devices
o   Linepipe-Flanges-Fittings, Flow and Pressure Loss
o   Corrosion and Corrosion Control
o   Beam Pumping (Surface Units)
o   Gas Lifting
 